Carrying out the executive operations of the plan to develop the capacity of the sanitary wastewater treatment plant of Isfahan’s Mobarakeh steel complex, including the following:
Preparation of materials, transportation, implementation and testing of all excavation, construction and landscaping operations required by the project
Procurement, materials, construction, transportation, execution, installation, testing, training of operating personnel and commissioning of all mechanical, electrical, control and precision instruments required by the project.